Commit Graph
11 Commits
Author SHA1 Message Date
itsmattkc 1aa87cbda6 various: encapsulate all code in the olive namespace to avoid name collisions
Large-scale code cleanup. Also adds a license to the top of all files that were
missing it.
2020-04-06 15:29:53 +10:00
itsmattkc 2bda306866 timeline/various: implemented block copy/paste
Implemented the ability to copy/paste blocks/clips in the timeline. This did
require some large scale changes and reworking of the copy/paste system
introduced a few commits ago, but should be largely functional now.
2020-03-31 02:19:05 +11:00
itsmattkc 22046535ca various: added hooks so that various lengthy functions could be cancelled from another thread 2020-02-17 02:10:12 +11:00
itsmattkc 6771a2f1cb implemented footage loading from projects
Footage is a special case where the node parameters can reference objects that
exist outside of the graph. Therefore specific code is needed to
serialize/deserialize.
2020-01-15 18:26:42 +11:00
itsmattkc 16878e3c25 implemented much of the project loading logic
Still not functional, but much of the groundwork is done.
2020-01-13 04:09:06 +11:00
itsmattkc bb57884cac added save functions to various classes
Each class is responsible for its own saving and loading from the XML data
in order to reduce the complexity of the save code.
2020-01-12 18:36:31 +11:00
itsmattkc 56e3fd41e5 various UI reimplementations from 0.1.x 2019-09-26 03:49:49 +10:00
itsmattkc 5e3c2fb7e4 documented (nearly) ever class 2019-07-06 23:32:01 -05:00
itsmattkc a9ff2389e6 minor code cleanup 2019-07-06 21:17:19 -05:00
itsmattkc 55c869ac1b added copyright header to all source files 2019-06-22 23:26:31 -07:00
itsmattkc 771a250a81 fleshed out footage class 2019-06-22 22:57:01 -07:00