- riir.md: split project file read/write into standalone oakstorage module (pluggable backend, DB-replaceable); add Mermaid data flow diagram of all modules; adjust batch table and milestones - riir/04-interfaces.md: new provides/consumes contract matrix for all modules - riir/M10-oakstorage.md: new manual with frozen C API (typed opaque handles, manual vtable for storage backends, URI addressing) - riir/01: codify pure-C OO interface rules (typed handles instead of void*, init/free pairs, manual vtables, no C++ objects or member calls across shared library boundaries); upper layers issue commands only, no module-to-module event subscriptions (async task callbacks excepted) - sync 00/02/03 and M2-M9 manuals: remove subscribe APIs, replace void* with typed handles, update tests accordingly
4.6 KiB
4.6 KiB
M8 · oaktask 拆分手册
内容:
engine/task/(Task 基类、TaskManager、任务编排、cache 任务; 工程文件 IO——project/load/save/loadotio/saveotio 的落盘部分—— 已划给 oakstorage(M10),本模块只做任务壳)。 依赖:node 38、codec 4、render 4、common 4、config 2、timeline 1、 coreengine 2。 拆分顺序第 8 位。
1. 目标形态
oaktask/
include/oaktask/{task.h, manager.h, project.h, types.h, export.h}
src/
tests/ # oaktask_gtest
2. 冻结 C API
2.1 oaktask/task.h(单任务句柄,照 oakengine/task.h 模板对齐)
typedef struct OakTaskTask OakTaskTask;
OAKTK_API void oaktask_task_free(OakTaskTask *t);
OAKTK_API int oaktask_task_start(OakTaskTask *t); /* 异步 */
OAKTK_API int oaktask_task_start_sync(OakTaskTask *t);
OAKTK_API int oaktask_task_cancel(OakTaskTask *t);
OAKTK_API int oaktask_task_is_finished(const OakTaskTask *t);
OAKTK_API int oaktask_task_succeeded(const OakTaskTask *t);
OAKTK_API int oaktask_task_progress(const OakTaskTask *t, double *out);
OAKTK_API int oaktask_task_title(OakTaskTask *t, char *buf, int n);
OAKTK_API int oaktask_task_error(OakTaskTask *t, char *buf, int n);
/* 进度/完成回调:任务是异步命令,回调即其返回通道——04 §3 唯一
* 例外情形(一次性语义,FINISHED 后自动失效) */
OAKTK_API int64_t oaktask_task_subscribe(OakTaskTask *t, int32_t event_id,
oaktask_event_fn fn, void *userdata);
2.2 oaktask/project.h(任务工厂 + 结果访问器)
OAKTK_API OakTaskTask *oaktask_create_project_load(const char *filename);
OAKTK_API OakTaskTask *oaktask_create_project_save(OakNodeProject *p,
const char *filename_or_NULL, int use_compression,
const void *layout_or_NULL);
/* 注:以上两个工厂是薄壳——文件 IO 全部委托 oakstorage(M10 §2.4),
* 任务只保留进度/取消/事件编排;`use_compression` 等打包进
* oakstorage_save 的 options 位掩码。 */
OAKTK_API OakTaskTask *oaktask_create_project_import(OakNodeNode *folder,
const char *const *urls, int url_count);
OAKTK_API OakTaskTask *oaktask_create_project_load_otio(
const char *filename, const int *sequence_indexes, int count);
OAKTK_API OakTaskTask *oaktask_create_project_save_otio(
OakNodeProject *p, const char *filename, const int *sequence_indexes,
int count);
/* import 结果(task 成功后读,borrowed) */
OAKTK_API OakUndoCommand *oaktask_import_take_command(OakTaskTask *t); /* 所有权转移(2026-08 修订:按 01 §0.1 由 void* 改为有类型句柄) */
OAKTK_API int oaktask_import_footage_count(OakTaskTask *t);
OAKTK_API OakNodeNode *oaktask_import_footage_at(OakTaskTask *t, int i);
OAKTK_API int oaktask_import_invalid_count(OakTaskTask *t);
OAKTK_API int oaktask_import_invalid_at(OakTaskTask *t, int i,
char *buf, int n);
/* load 结果 */
OAKTK_API OakNodeProject *oaktask_load_take_project(OakTaskTask *t);
2.3 oaktask/manager.h
OAKTK_API int oaktask_manager_count(void);
OAKTK_API OakTaskTask *oaktask_manager_at(int i); /* borrowed */
OAKTK_API void oaktask_manager_delete_finished(void);
/* 无 manager 事件(2026-08 修订,04 §3):任务的创建/删除都由调用方
* 发起(facade 建任务即知 ADDED;delete_finished 的调用方知 REMOVED),
* LIST_CHANGED 通知由调用方所在层发出。 */
3. 切割点
| 现状 | 处理 |
|---|---|
| task → node/ 38(footage 6、project 5、sequence 3、serializer/layout 3、colormanager 2 等) | 全部经 oaknode C ABI + 适配类(M3 已就位)——本手册工作量主体 |
| task → 工程文件 IO(load/save/loadotio/saveotio 落盘) | 划给 oakstorage(M3a/M10):任务工厂保留签名,实现改为委托 oakstorage_open/save |
| task → codec/ 4 | 经 oakcodec C ABI(M5) |
| task → render/ 4 | 经 oakrender C ABI(M7) |
| task → timeline/ 1 | 经 oaktimeline C ABI(M4) |
| task → coreengine.h 2 | coreengine 的 Task 注册点改为 oaktask_manager 自管(manager 原本就是单例,注册调用内聚进 oaktask) |
4. 测试(映射 03 §2/§3)
- 每个工厂 1 个用例:demo.mp4 import(footage_count>0、command 可 入栈)、save/load 往返(临时目录 .ove,load 后 project 非空、 root 非空)。
- start_sync 成功/失败路径(不存在文件 → failed + error 非空)。
- 事件(异步任务例外):STARTED→PROGRESS→FINISHED 序列(导入任务 断言至少一次 PROGRESS 且 FINISHED.succeeded==1)。
- manager:count/at/delete_finished 行为(无事件,直接读状态断言)。
oaktask_debug_alive_count()泄漏断言。