Commit Graph
3 Commits
Author SHA1 Message Date
Mike-Solar 3cc6f75ccc docs: archive completed plans, add the external plugin system design
- docs/zh/plans: finished plans move to completed/ (the RIIR series, the
  event-bridge and dependency plans, the v04 manual test plan).
- New design docs: the external (functional) plugin system
  (process-isolated, JSON-RPC/shm) and its protocol.
- ai-agent-design refreshed; README pointers follow the moves.
2026-08-25 03:03:28 +08:00
Mike-Solar dd5508e571 docs: archive completed C ABI campaign docs under plans/completed/
Move the finished migration campaign docs (handoffs v3-v6, roadmap,
R5 guides, R6 cleanup, R7 pure-ABI) from docs/zh/ into
docs/zh/plans/completed/ with an archive README; fix all
cross-references; refresh plans/README.md index (active plans now
marked unlocked).
2026-07-27 01:52:52 +08:00
Mike-Solar c486c853ff docs: C ABI migration campaign plans, handoffs and roadmap
Complete documentation set for the facade migration (B1-R6) and beyond:
facade-migration-roadmap, handoffs v3-v6, R5 guides, R6 cleanup plan,
R7 pure-ABI plan, long-term plans (riir/ai-agent/gtest/ui-redesign),
updated Chinese README draft, UI design mockups, and the Google Test +
struct-typedef rules in CONTRIBUTING.
2026-07-26 22:42:44 +08:00