docs: C ABI migration campaign plans, handoffs and roadmap
Complete documentation set for the facade migration (B1-R6) and beyond: facade-migration-roadmap, handoffs v3-v6, R5 guides, R6 cleanup plan, R7 pure-ABI plan, long-term plans (riir/ai-agent/gtest/ui-redesign), updated Chinese README draft, UI design mockups, and the Google Test + struct-typedef rules in CONTRIBUTING.
This commit is contained in:
Binary file not shown.
|
After Width: | Height: | Size: 2.2 MiB |
Reference in New Issue
Block a user